Planning Documents
- Educational Master Plan
- Facilities Master Plan
- District Standards
- Fairfield Campus Library/Learning Resource Center – CEQA
- Fairfield Campus New Science Building – CEQA
- Vacaville Center Biotech & Science Building – CEQA
- Vallejo Automotive Technology Building – CEQA
- Contracts
Education Master Plan
Date | Education Master Plan |
---|---|
07/10/14 | Educational Master Plan |
06/20/14 | Educational Master Plan Update |
Facilities Master Plan
District Standards
Fairfield Campus Library - Learning Resource Center - CEQA
Fairfield Campus New Science Building - CEQA
Date | Document |
---|---|
05/04/16 | Fairfield Campus New Science Building - Mitigation Monitoring and Reporting Program |
03/31/16 | Fairfield Campus New Science Building Mitigated Negative Declaration – Draft |
03/31/16 | Appendix A: Cultural Resources |
03/31/16 | Appendix B: Geotech Investigation |
03/31/16 | Appendix C: Noise Analysis |
03/31/16 | Appendix D: Traffic Analysis |
Vacaville Center Biotech & Science Building – CEQA
Vallejo Automotive Technology Building – CEQA
Contracts
Please click on the Meeting Date to see enclosed documents.
BOT Meeting 8/2/2023
BOT Meeting 7/19/2023
- Contract Amendment #1 to Optima Inspections Inc. for Additional Project Inspection Services for the Early Learning Resource Center Project
- Contract Amendment #1 to Optima Inspections, Inc. for Additional DSA Inspection Services for the Vallejo Autotech Security Enhancement Project
- Contract Award to Arthulia, Inc. for Construction Services for Fairfield Campus Parking Lot Enhancement Project
- Contract Award to Optima Inspections, Inc. for Project Inspection Services for the Fairfield Campus Parking Lot Enhancement Project
BOT Meeting 6/21/2023
- Contract Amendment #1 to PB Electric, Inc. for Design-Build Construction Services for the Substation #3 and #4 Replacement Project
- Contract Amendment #3 to Kate Keating & Associates, Inc. (Clearstory, Inc.) for Additional Professional Services for the Vacaville Center Map & Wayfinding Standards Revision
- Contract Award to Aedis Architects for the Fairfield Campus Building 1600 Modernization Project
- Contract Award to GeoCon Consultants, Inc. for the Fairfield Campus Substation #3 & #4 Replacement Project
BOT Meeting 6/07/2023
- Contract Award to Optima Inspections Incorporated for Project Inspection Services for the Fairfield Campus Substation #3 & #4 Replacement Project
- Contract Award to Optima Inspections Incorporated for Project Inspection Services for the Central Plant Replacement Project
- Contract Award to Ninyo & Moore for Material Testing & Special Inspection Services for the Central Plan Replacement Project
- Contract Amendment #2 to Aedis Architects for Additional Professional Services for the Swimming Pool Deck Replacement Project
BOT Meeting 5/17/2023
- Contract Award to Lionakis for Architectural Services for the Main Entrance Improvement Project
- Contract Amendment #1 to Brooktrout Designs for Architectural Engineering Services for the Gym Audio-Video Enhancement Project
- Contract Award to Kitchell Capital Expenditure Management for Facilities Asset Management Services Project
BOT Meeting 5/3/2023
- Notice of Completion for Information Technology Implementation Services for the Library/Learning Resource Center Project
- Contract Award to Matrix HG, Inc. for Construction Services for the Central Plant Replacement Project
- Contract Award to Salas O’Brien for Commissioning Services for the Central Plant Replacement Project
- Contract Award to Yocha Dehe Wintun Nation for Tribal Monitoring Services for Various Projects
- Contract Award to JK Architecture Engineering for the Autotech Vehicle Dynamometer Systems Evaluation and Exhaust System Replacement Project
- Contract Amendment #2 to Vlaming and Associates, APC for Project Labor Agreement Coordination Services
BOT Meeting 4/19/2023
- Contract Award to Allana Buick & Bers, Inc. for the Vacaville Center Water Intrusion Project
- Contract Award to HMR Architects, Inc. for the Building 1800 Maker Space Awning Project
- Contract Award to HMR Architects, Inc. for the Building 1800B Power/Electrical Project
- Notice of Completion for Construction Services for Testing and Repair Services for the Fiber Network Ring Repair Project
BOT Meeting 4/5/2023
- Contract Award to Waterworks Industries, Inc. for Construction Services for the Fairfield Campus Pool Deck Replacement Project
- Contract Award to Optima Inspections Incorporated for Project Inspection Services for the Fairfield Campus Pool Deck Replacement Project
- Contract Award to Ninyo & Moore for Material Testing & Special Inspection Services for the Fairfield Campus Pool Deck Replacement Project
- Contract Amendment #2 to Aedis Architects for Additional Professional Services for the Building 300 Modernization Project
- Equipment Order to Development Group, Inc. for Information Technology Infrastructure Project – Remaining District Wireless Refresh
BOT Meeting 3/1/2023
BOT Meeting 2/15/2023
- Contract Award to Aedis Architects for Architectural Services for the Campus-Wide Interior Refresh Project
- Contract Award to Optima Inspections Inc. for Project Inspection Services for the Fairfield Campus Solar Energy Project
- Contract Awaard to Wallace Kuhn and Associates for Material Testing & Special Inspection Services for the Fairfield Campus Solar Energy Project
BOT Meeting 2/01/2023
- Approval of Contract Change Order #2 to Arthulia, Inc. for the Fairfield Campus Baseball-Softball Clubhouses Project
- Contract Award to Conti LLC for the Fairfield Campus Library/Learning Resource Center Project
- Contract Award to Facilities Planning & Consulting Services for Grant-Writing Services for the On-Campus Housing Project
- Contract Award to Development Group, Inc. for Information Technology Infrastructure Project – Hyperflex Cluster Addition
BOT Meeting 12/21/22
BOT Meeting 12/7/22
- Contract Award to CSW|ST2 for Project Design Services for Fairfield Campus Parking Lot Improvements Project
- Contract Award to HMR Architects, Inc. for the Vallejo Center Security Study Project
- Contract Amendment #1 to Aedis Architects for Additional Professional Services for the Building 300 Modernization Project
- Contract Award to Aedis Architects for Architectural Services for the Building 1600 Cosmetology Modernization Project
- Change Order #1 to American Modular Systems Inc. for the Fairfield Campus Early Learning Center Project
- Contract Award to HPI Architecture for Architectural Planning Services for the On-Campus Housing Project
- Contract Award to Development Group, Inc. for Information Technology Infrastructure Project: Campus-Wide Switching Refresh
BOT Meeting 11/16/22
Project Awards
- Notice of Completion for Construction Services for the Library/Learning Resource Center (LLRC) Project
- Contract Change Order #22 to BHM Construction, Inc. for the Fairfield Library/Learning Resource Center Project
- Contract Amendment #2 to Sally Swanson Architects, Inc. for Professional Services for the District’s ADA Transition Planning and Mapping Project
- Contract Award to Optima Inspections, Inc. for Project Inspection Services for the Vacaville Campus Annex HVAC & Roof Replacement Project
- Contract Award to PB Electric, Inc. for the Design and Construction of the Substation #3 & 4 Replacement Project
BOT Meeting 11/2/22
Project Awards
BOT Meeting 10/19/22
Project Awards
- Contract Award to Arthulia, Inc. for Construction Services for Autotech Security Enhancement Project on the Vallejo Campus
- Contract Award to Optima Inspections, Inc. for Project Inspection Services for the Vallejo Campus Autotech Security Enhancement Project
- Contract Award to MBC Enterprises Inc. for Construction Services for the Fairfield Campus Early Learning Center Project
- Contract Award to Optima Inspections Inc. for Project Inspection Services for the Fairfield Campus Early Learning Center Project
- Contract Award to Integrity Data & Fiber Inc. for Testing and Repair Services for the Fiber Network Ring Repair Project
BOT Meeting 10/5/22
Project Awards
BOT Meeting 9/21/22
Project Awards
BOT Meeting 9/7/22
Project Awards
BOT Meeting 8/17/22
Project Awards
- Contract Amendment #1 to PG&E Ten-Year License Agreement for the Vacaville Annex as a Community Resource Center
- Contract Amendment #1 to A3GEO, Inc. for Additional Professional Services for the Aeronautics Nut Tree Facilities Improvements Project
- Contract Amendment #2 with Salas O’Brien for Additional Professional Services for the Vacaville Annex Environmental Project
- Contract Amendment #4 to Noll & Tam Architects for Professional Services for the Library/Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 8/3/22
Project Awards
- Contract Amendment #2 to Swinerton Management & Consulting for Construction Management Services for the Library/Learning Resource Center Project (Building 100 Replacement)
- Contract Award to Sactown Contractors Corp for Construction Services for the Building 1400 Lighting Upgrade
- Contract Award to Developmental Group, Inc. for Information Technology Equipment and Implementation Services for the Phase 2 Annual Network Upgrades Project
BOT Meeting 7/20/22
Project Awards
- Approval of Contract Change Order #1 to Arthulia Inc. for the Fairfield Campus Baseball/Softball Clubhouse Replacement Project
- Approval of Contract Change Order #21 to BHM Construction, Inc. for the Fairfield Library/Learning Resource Center Project
- Approval of Contract Change Order #1 to Lister Construction for the Vacaville Aero Sewer Connection and Parking Expansion Project
- Contract Amendment #1 to Sally Swanson Architects, Inc. for Time Extension for Professional Services for the District’s ADA Transition Planning and Mapping Project
BOT Meeting 6/15/22
Project Awards
BOT Meeting 6/1/22
Project Awards
BOT Meeting 5/18/22
Project Awards
- Change Order #20 for BHM Construction for Construction Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Contract Award for Aedis Architects for Professional Services for the Swimming Pool Concrete Deck Replacement Project
- Contract Award for Aedis Architects for Professional Services for the Fairfield Campus Building 300 Modernization Project
- Lease Agreement Extension for Williams Scotsman, Inc. for Modular Building
BOT Meeting 5/4/22
Project Awards
BOT Meeting 4/20/22
Project Awards
BOT Meeting 4/6/22
Project Awards
BOT Meeting 3/16/22
Project Awards
- No Projects Awarded
BOT Meeting 3/2/22
Project Awards
- Change Order #19 for BHM Construction for Construction Services for the Library and Learning Resource Center Project (Building 100 Replacement)\
- Contract Amendment #1 for PMP Environmental Consulting, Inc. for Professional Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Contract Amendment #3 for Noll & Tam Architects for Professional Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Contract for Salas O'Brien for Professional Services for the Fairfield Campus Central Plant Replacement Project
- Contract for Salas O'Brien for Professional Services for the Fairfield Campus Replacement Substations #3 and #4 Project
BOT Meeting 2/17/22
BOT Meeting 2/2/22
Project Awards
BOT Meeting 1/19/22
Project Awards
- Measure Q Bond Project Initiation - IT Infrastructure Improvements Project - Phase 4
- Measure Q Bond Project Initiation - Small Capital Projects - Phase 4
- Measure Q Bond Project Initiation - Vacaville Annex Cares Act Upgrade Project
- Surplus Furniture for the Library Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 12/15/21
Project Awards
- Contract Amendment #1 for Scion Group for Professional Services for the On-Campus Housing Project
- Contract Amendment #1 for Swinerton Management & Consulting for Professional Services for the Library and Leraning Resource Center Project (Building 100 Replacement)
- Contract Award for Optima Inspections Inc. for Professional Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Contract Award for Arthulia Inc. for Construction Services for the Baseball-Softball Clubhouse Project
BOT Meeting 12/1/21
BOT Meeting 11/18/21
Project Awards
- Contract Amendment #1 for First Carbon Solutions for Professional Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Change Order #17 for BHM Construction for Construction Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Purchase Order Increase for Krueger International, Inc. for the Library and Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 11/3/21
Project Awards
- Contract Amendment #1 for Consolidated Engineering Laboratories (CEL) for Professional Services for the Steel Frame Outdoor Covered Welding Shop Area Project
- Contract Amendment #2 for Noll & Tam Architects for Professional Services for the Libaryar and Learning Resource Center Project (Building 100 Replacement)
- Change Order #1 (Deductive) for Color New Co. for Construction Services for the Fairfield Campus Building Exteriors Project Phase 2
BOT Meeting 10/20/21
Project Awards
- Contract Amendment #1 for Optony Inc. for Professional Services for Solar Energy Project
- Contract Award to Security & Cabling Solutions, Inc. for Construction Services for the Fairfield Campus Door Hardware Installation Project
- Contract Award to TPA Construction, Inc. for Construction Services for the Vacaville Center Annex Building Corbels Removal Project Phase 3
BOT Meeting 10/6/21
Project Awards
- Change Order #16 for BHM Construction for Construction Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Change Order #2 (Deductive) for J-Walt Construction, Inc. for Construction Services for the Steel Frame Outdoor Covered Welding Shop Area Project
- Contract Amendment #1 for 3QC, Inc. for Professional Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Contract Award for Aedis Architecture for Professional Services for the Vallejo Auto Tech Vehicle Security Project
- Contract Award for HMR Architects for Professional Services for the Fairfield Campus Early Learning Center Modernization Project
- Contract Award for TPA Construction for Construction Services for the Building 400 Stucco Repair Project
- Purchase Order Award for American Modular Systems, Inc. for DSA the Fairfield Campus Early Learning Center Center Modernization Project
- Purchase Order Award for One Workplace for the Library and Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 9/1/21
Project Awards
- Contract Amendment #1 for Salas O'Brien for Professional Services for the Vacaville Annex Environmental Improvement Project
- Contract Amendment #1 for Optima Inspections, Inc. for Professional Services for the Library Learning Resource Center Project (Building 100 Replacement)
- Purchase Order Award for Sterling for the IT Infrastructure Improvements Project
BOT Meeting 8/18/21
Project Awards
- Change Order #1 for J-Walt Construction, Inc. for Construction Services for the Steel Frame Outdoor Covered Welding Shop Area Project
- Contract Award for T&R Communications, Inc. for Construction Services for the Vallejo Center Cell Repeater Installation Project
- Contract Award for Salas O'Brien for Professional Services for the Fairfield Campus Central Plant and Electrification Study
- Contract Award to Salas O'Brien for Professional Services for the Fairfield Campus Pool and Equipment Study
- Contract Award to Salas O'Brien for Professional Services for the Fairfield Campus Substation #3 Study
- Award of Purchase Order for Enviroplex for DSA Pre-Approved Modular Buildings
- Award of Purchase Order for Sterling for the Library and Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 7/21/21
Project Awards
- Change Order #15 for BHM Construction for Construction Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Contract Award for Development Group, Inc. for Construction Services for the Library and Learning Resource Center Project (Building 100 Replacement)
- Contract Award for T&R Communications, Inc. for Construction Services for the Vallejo Center Cell Repeater Installation Project
- Purchase Order Award for Nick's Custom Golf & Utility Vehicles for the Facilities Department
BOT Meeting 6/16/21
Project Awards
- Contract Award for Sally Swanson Architects, Inc. for Professional Services for the District's ADA Improvements Project
- Contract Award for The Scion Group for Professional Services for the District's On-Campus Housing Project
- Contract Award for Sequoia Signs & Graphics, Inc. for Construction Services for the Nursing Simulation Lab Wall Wrap Project
- Contract Award for Morgan Fencec Company, Inc. for Construction Services for the Belvedere Fence Project
- Contract Award for Jeff Painting for Construction Services for the Building 200 Fence Painting Project
- Contract Award for Arthulia, Inc. for Construction Services for the Nursing Simulation Lab Wall Wrap Preparation Project
BOT Meeting 6/2/21
Project Awards
- Contract Award for Airco Mechanical, Inc. for Construction Services for the Autotech Noise Reduction Project
- Contract Award for Arthulia, Inc. for Construction Services for the B1600 Cosmetology Improvements Project
- Contract Award for TPA Construction, Inc. for Construction Services for the Vacaville Center Annex Building Corbels Removal Project Phase 2
- Purchase Order Increase for Miles Treaster & Associates for the Library Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 5/19/21
BOT Meeting 5/5/21
Project Awards
BOT Meeting 4/21/21
Project Awards
- Change Order #13 for BHM Construction for Construction Services for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Award for Integrity Data & Fiber Inc. for Construction Services for Outdoor Wireless Access Point Project
- Contract Award for Ojo Technology Inc. for Construction Services for Campus Wide Security Camera Replacement Project
- Contract Award for Optony Inc. for Professional Services for Solar Energy Project
- Award of Purchase Order to Miles Treaster & Associates for Library Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 4/7/21
Project Awards
- Change Order #12 for BHM Construction for Construction Services for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Award for J-Walt Construction, Inc. for Construction Services for the Steel Frame Outdoor Covered Welding Shop Area Project
- Contract Award for Optima Inspections Inc. for Professional Services for the Steel Frame Outdoor Covered Welding Shop Area Project
- Contract Award for Consolidated Engineering Laboratories for Professional Services for the Steel Frame Outdoor Covered Welding Shop Area Project
- Contract Award for Silverado Wallcovering for Construction Services for the Classroom Technology Upgrade - Building 2700 Dry Erase and Projectable Wallcovering Project
- Contract Award for Aedis Architects for Professional Services for Fairfield Campus Building 300 Modernization Project
BOT Meeting 3/17/21
Project Awards
- No Projects Awarded
BOT Meeting 3/3/21
Project Awards
BOT Meeting 2/17/21
Project Awards
- Contract Amendment #2 for Applied Materials & Engineering, Inc. for Professional Services for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Award for PB Electric, Inc. for Construction Services for the Library Learning Resource Center Project (Building 100 Replacement)
- Approval of Renewable Energy Consultant Service Pool of Firms
BOT Meeting 2/3/21
Project Awards
- No Projects Awarded
BOT Meeting 1/20/21
Project Awards
- Contract Amendment #1 for CSW Stuber-Stroeh Engineering Group, Inc. for Professional Services for the Aeronautics Nut Tree Facility Improvements Project
- Contract Amendment #1 for HMR Architects for Professional Services for the Fairfield Campus Baseball and Softball Clubhouse Project
- Change Order #10 for BHM Construction for Construction Services for the Library Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 12/16/20
Project Awards
- No Projects Awarded
BOT Meeting 12/2/20
Project Awards
- No Projects Awarded
BOT Meeting 11/18/20
BOT Meeting 10/21/20
BOT Meeting 10/7/20
Project Awards
BOT Meeting 9/16/20
Project Awards
- Change Order #1 to Arthulia, Inc. for the Building 300 Modifications: Mailroom and Graphics Project
- Change Order #1 to Pro Builders for the Baseball Field and Soccer Field Bleacher Replacement Project
- Contract Award to Arthulia, Inc. for Construction Services for the Early College High School Portables Project
- Contract Award to Clawson Automotive Equipment and Service, Inc. for Installation Services and Snap-On Industrial for Equipment for the Auto Tech Tool Room Project
BOT Meeting 9/2/20
Project Awards
BOT Meeting 8/19/20
Project Awards
- Change Order #8 to BHM Construction for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Amendment #1 for Applied Materials and Engineering, Inc. for Professional Services for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Amendment #1 to Aedis Architects for Professional Services for the Fairfield Campus Baseball and Soccer Bleacher Replacement Project
- Contract Amendment #1 to Salas O'Brien for Professional Services for the Building 300 HVAC Assessment Project
- Lease Agreement with County of Solano for Nut Tree Airport Aeronautics Program Hangar
BOT Meeting 8/5/20
BOT Meeting 7/15/20
Project Awards
- Change Order #7 to BHM Construction for the Library Learning Resource Center Project (Building 100 Replacement)
- Change Order #1 to William Scotsman, Inc. for the Fairfield Campus Early College High School Portables Project
- Contract Amendment #1 to Ninyo & Moore for Professional Services for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Amendment #1 to Aedis Architects for Professional Services for the Fairfield Campus Building Exteriors Project
- Contract Award to HMR Architects for the Fairfield Campus Baseball and Softball Locker Room Project
- Approval to Reject Informal Bids for Construction Services for the Fairfield Campus Early College High School Portables Project
- Adoption of Resolution of Intent to Convey Maintenance Easements to City of Vacaville
BOT Meeting 6/17/20
Project Awards
BOT Meeting 6/3/20
BOT Meeting 5/20/20
Project Awards
BOT Meeting 5/6/20
Project Awards
- Change Order #5 to BHM Construction for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Award to HMR Architects for Professional Services for the Building 1800B Exterior Roof Canopy Project
- Award of Purchase Agreement to Williams Scotsmand, Inc., for Modular Classrooms
BOT Meeting 4/15/20
Project Awards
- Change Order #4 to BHM Construction for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Award to Salas O'Brien for Professional Services for the Building 300 HVAC Assessment Project
- Contract Award to Matthews Electric for Construction Services for the Building 400 Lighting Replacement Project
- Award of Purchase Order to Sterling for Technology to Support Distance Learning
- Lease Agreement Extension to William Scotsman, Inc. for Modular Buildings
BOT Meeting 4/1/20
Project Awards
BOT Meeting 3/18/20
Project Awards
- Contract Award to A3GEO, Inc. for Professional Services for the Fairfield Parking Lot #01 Resurfacing Project
- Contract Award to HMR Architects for Professional Services for the Early College High School Portables Project
- Contract Award to Arthulia, Inc. for Construction Services for the Building 300 Modifications: Mailroom and Graphics Project
- Contract Award to RBH Construction, Inc. for Construction Services for the Vacaville Center Storage Enclosure Project
- Contract Award to Pro Builders for Construction Services for the Fairfield Baseball Field and Soccer Field Bleacher Replacement Project
- Contract Award to O.C. Jones and Sons, Inc. for Construction Services for the Fairfield Campus Parking Lot No. 01 Resurfacing Project
BOT Meeting 3/4/20
Project Awards
- Contract Award to Sierra Striping Inc. and Sealcoating for Construction Services for the Fairfield Campus Perimeter Road Striping Project
- Contract Award to Lister Construction, Inc. for Construction Services for the Building 800 Parking Lot Rehabiliation Project
- Contract Award to Lister Construction, Inc. for Construction Services for the Building 1900 Trench Drain Project
- Award of Purchase Order to One Diversified for the Classroom Technology Upgrade (IT Infrastructure Improvements) Project
- Award of Purchase Order to Garton Tractor, Inc. for the Facilities Department
BOT Meeting 2/19/20
Project Awards
- Change Order #3 to BHM Construction for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Award to Armour Petroleum Service and Equipment Corporation for Construction Services for the Aeronautics Nut Tree Facility Propane Heating Repair Project
- Contract Award to HMR Architects for Professional Services for the Fairfield Campus Early Learning Center Project
- Award of Purchase Order to U.S. Security Supply, Inc. for the District Wide Security Lockdown System
BOT Meeting 2/5/20
Project Awards
BOT Meeting 1/15/20
Project Awards
- Contract Amendment #1 to CA Architects for Professional Services for the Vacaville Center Annex Corbels Removal Project Phase 2
- Change Order #1 to BHM Construction for the Library Learning Resource Center Project (Building 100 Replacement)
- Contract Award to Aedis Architects for Professional Services for the Fairfield Campus Exterior Repaint Project
- Contract Award to Integrity Data & Fiber for Construction Services for the Smart Classroom Upgrade Project
- Contract Award to Pacific Lift and Equipment Company, Inc. for Construction Services for the Autotech Dyno Room Reconfiguration Project
- Award of Purchase Order to Krueger International, Inc. for Furniture for the Library Learning Resource Center Project (Building 100 Replacement)
- Award of Purchase Order to One Workplace for Furniture for the Library Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 12/18/19
Project Awards
BOT Meeting 12/4/19
Project Awards
- Contract Amendment #2 to HMR Architects for Professional Services for the B300 Modifications: Mailroom and Graphics Project
- Contract Award to Rudolph and Sletten for Construction Services for the Biotechnology Casework Improvement Project
- Contract Award to Kate Keating & Associates, Inc. for Professional Services for the Fairfield Campus Site Signage Master Plan and Wayfinding Signage Project
- Award of Purchase Order to One Diversified for the Classroom Technology Upgrade Phases 3 & 4 (IT Infrastructure Improvements) Project
BOT Meeting 11/20/19
Project Awards
- Contract Amendment #2 to Kate Keating & Associates, Inc. for Professional Services for Wayfinding Project
- Contract Award to CSW Stuber-Stroeh Engineering Group, Inc. for Professional Services for the Parking Lot #1 Resurfacing Project
- Contract Award to Wall 2 Wall Painting, Inc. for Construction Services for the Building 1400 Interior Painting Project
BOT Meeting 11/6/19
Project Awards
BOT Meeting 10/16/19
Project Awards
- Contract Award to PMP Environmental Consulting for Professional Services for the B300 Modifications: Mailroom and Graphics Project
- Contract Award to TPA Construction for Construction Services for the Vacaville Annex Corbels Project
- Contract Award to Optima Inspections Inc. for Professional Services for the Library/Learning Resources Center Project (Building 100 Replacement)
- Contract Award to 3QC, Inc. for Professional Services for the Library/Learning Resource Center Project (Building 100 Replacement)
- Contract Award to Applied Materials & Engineering, Inc. for Professional Services for the Library/Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 10/2/19
Project Awards
BOT Meeting 9/18/19
Project Awards
BOT Meeting 9/4/19
Project Awards
BOT Meeting 8/7/19
Project Awards
BOT Meeting 7/17/19
Project Awards
BOT Meeting 6/19/19
Project Awards
BOT Meeting 6/5/19
Project Awards
BOT Meeting 5/15/19
Project Awards
BOT Meeting 5/1/19
Project Awards
BOT Meeting 4/17/19
BOT Meeting 4/3/19
Project Awards
BOT Meeting 3/6/19
Project Awards
BOT Meeting 2/20/19
Project Awards
BOT Meeting 2/6/19
Project Awards
BOT Meeting 1/16/19
Project Awards
BOT Meeting 12/20/18
Project Awards
BOT Meeting 12/5/18
Project Awards
BOT Meeting 11/20/18
Project Awards
BOT Meeting 11/7/18
Project Awards
BOT Meeting 10/17/18
Project Awards
BOT Meeting 10/3/18
Project Awards
BOT Meeting 09/19/18
Project Awards
BOT Meeting 09/05/18
BOT Meeting 08/15/18
Project Awards
BOT Meeting 08/01/18
Project Awards
BOT Meeting 07/18/18
Project Awards
BOT Meeting 06/20/18
Project Awards
BOT Meeting 06/06/18
Project Awards
BOT Meeting 05/16/18
Project Awards
BOT Meeting 05/02/2018
Project Awards
BOT Meeting 04/18/2018
Project Awards
BOT Meeting 04/04/2018
BOT Meeting 03/21/2018
Project Awards
-
Contract Amendment #2 for Kitchell Capital Expenditure Managers, Inc. for Professional Services
-
Change Order #4 to HM Construction for the Fairfield Campus Entry Sidewalk Project
-
Change Order #4 for DPR for the Fairfield Science Building Project
-
Lease Renewal to William Scotsman Inc. for Modular Buildings
BOT Meeting 03/07/2018
BOT Meeting 02/21/2018
Project Awards
BOT Meeting 02/7/2018
Project Awards
- Ratification of Contract to First Carbon Solutions for the Campus Entry Sidewalk Project
- Ratification of Contract to Yocha Dehe Wintun Nation for the Campus Entry Sidewalk Project
- Change Order #3 to HM Construction for the Fairfield Campus Entry Sidewalk Project
- Change Order #3 to Vaca Valley Excavating and Trucking for the Vacaville Center Intersection Improvements Project
- Change Order #1 (Deductive) to Ellis & Ellis Sign Systems for the Fairfield Campus Directory Signs Project
- Contract Amendment #1 to Ninyo & Moore for the Vacaville Intersection Improvements Project
- Contract Award to Eppendorf North America for Professional Services for the Biotechnology and Science Building Project
- Contract Award to HM Construction for Construction Services for the Horticulture Modular Building Foundation and Site Work Project
- Contract Award to Arthulia Inc. for Construction Services for the Building 600 Room 604 Renovation Project
- Contract Award to Optima Inspections for Inspection Services for the Building 600 Room 604 Renovation Project
BOT Meeting 01/17/2018
Project Awards
- Change Order #2 (Deductive) to Landmark Construction for the Softball Bleacher Replacement Project
- Contract Change Order #2 to HM Construction Inc. for the Fairfield Campus Entry Sidewalk Improvements Project
- Contract Change Order #15 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
- Contract Award to Swinerton Management and Consulting for Construction Management Services for the Vacaville Center HVAC Improvements Project
- Contract Award to tBP Architecture for Architectural and Engineering Services for the Building 1800B Corridor Project
- Contract Award to HM Construction, Inc. Construction Services for the Pavement Rehabilitation Project
- Contract Award to Lister Construction, Inc. for Construction Services for the Parking Lot Island Improvements Project
- Contract Award to Optima Inspections Inc. for Project Inspection Services for the Building 1000 Re-Roofing Project
- Contract Award to Solano County Roofing, Inc. for Construction Services for the Building 1000 Re-Roofing Project
BOT Meeting 12/20/2017
Project Awards
- Resolution No. 17/18-14: Ratification of Contract Change Order #1 to HM Construction Inc. for the Fairfield Campus Entry Sidewalk Improvements Project
- Resolution No. 17/18-15: To Approve Change Order #3 to Sierra National Construction Inc. for Sub-Station #1 & #2 Replacement Project
- Contract Change Order #4 to Rudolph and Sletten, Inc. for the Biotechnology and Science Building Project
- Contract Change Order #2 to Vaca Valley Excavating & Trucking, Inc. for the Vacaville Center Intersection Improvements Project
- Contract Change Order #14 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase 1) Project
- Contract Amendment #3 with LPAS for Building 1200 Theater Renovation Project Architectural Services
- Contract Amendment #1 to Valley Relocation and Storage for Project Moving Services for the Vacaville Classroom Building (Annex) Renovation Project, Room 604 Renovation Project, B1800B Renovation Project
- Contract Amendment #1 with Pavement Engineering, Inc. for Professional Services for the Pavement Rehabilitation Project
- Ratification of Amendment #2 to Advent Engineering Services, Inc. for Professional Services for the Biotechnology and Science Building Project
- Ratification of Contract Amendment #1 to A2R Architects for the Room 604 Renovation Project
- Ratification of Contract to Arthulia Inc. for Construction Services for the Maker's Space Room 1852 Project
- Contract Award to tBP Architecture Inc. for Architectural and Engineering Services for the B1800B Corridor Project
- Contract Award to Facilities Planning and Consulting Services for the Library/Learning Resource Center Project (Building 100 Replacement)
- Contract Award to CA Architects for Architectural and Engineering Services for the Building 1800B Maker's Space and Robotics Lab Project
- Contract Award for Construction Services to McCuen Construction Inc. for the Vacaville Classroom Building (Annex) Renovation Project
- Contract Award to Impact Construction Services, Inc. for Construction Services for the Horticulture Modular Restroom Building
- Contract Award for Construction Services to Schetter Electric, Inc. for Autotechnology Building Parts Washer Electrical Modification Project
BOT Meeting 12/06/2017
Project Awards
- Contract Change Order #2 to DPR Construction for the Fairfield Science Building Project
- Contract Award to Consolidated Engineering Laboratories for Project Special Inspection and Testing Services for the Building 100 Generator Project
- Contract Award to Facilities Planning and Consulting Services for the Library/Learning Resource Center Project (Building 100 Replacement)
- Contract Award to Optima Inspections Inc. for Inspection Services for the Building 100 Generator Project
- Contract Award to Day's Generator Service for Construction Services for the Building 100 Generator Project
- Measure Q Bond Project Initiation - Vacaville Center HVAC Upgrade Project
BOT Meeting 11/15/2017
Project Awards
- Contract Amendment #1 with Consolidated Engineering Laboratories for Project Special Inspection and Testing Services for the New Science Building Project
- Contract Award to Valley Relocation and Storage for Project Moving Services for the Vacaville Classroom Building (Annex) Renovation Project, Room 604 Renovation Project, B1800B Renovation Project
- Contract Award to Noll & Tam Architects for Professional Services for Library/Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 11/01/2017
Project Awards
- Contract Change Order #3 to Clark/Sullivan Construction for Autotechnology Project
- Contract Award to Construction Testing Services, Inc. for Project Special Inspection and Testing Services for the Vacaville Classroom Building (Annex) Renovation Project
- Contract Award to Integrity Data & Fiber Inc. for Network Cabling Services for the Districtwide Information Technology Infrastructure Improvements Project
BOT Meeting 10/18/2017
Project Awards
- Contract Change Order #3 to Rudolph and Sletten, Inc. for the Biotechnology and Science Building Project
- Contract Award to Consolidated Engineering Laboratories for Project Special Inspection and Testing Services for the Horticulture Modular Restroom Project
- Contract Award to CSW/Stuber-Stroeh Engineering, Inc. for Civil Engineering Services for Library/Learning Resource Center Project
- Contract Award to First Carbon Solutions for Environmental Consulting Services for Library/Learning Resource Center Project (Building 100 Replacement)
- Contract Award to Andy's Roofing Company, Inc. for Construction Services for the Building 1500 Re-Roofing Project
- Contract Award to Ninyo & Moore for Geotechnical Services for Library/Learning Resource Center Project (Building 100 Replacement)
BOT Meeting 10/04/2017
Project Awards
- Contract Change Order #2 to Sierra National Construction, Inc. for Sub-Station #1 & #2 Replacement Project
- Contract Change Order #1 to Vaca Valley Excavating & Trucking, Inc. for the Vacaville Center Intersection Improvements Project
- Deductive Contract Change Order #2 to DPR Construction for the Fairfiled Science Building Project
- Ratification of Amendment #1 to Advent Engineering Services, Inc. for Professional Services for the Biotechnology and Science Building Project
- Contract Award to Swinerton Management and Consulting for Construction Management Services for the Vacaville Classroom Building (Annex) Renovation Project
- Contract Award to EPC Group for Professional Services for the IT Infrastructure Project
- Contract Award to A2R Architects for Architectural Services for the Room 604 Renovation Project
- Contract Award to Digital Scepter for Equipment and Professional Services for the IT Infrastructure Project
BOT Meeting 09/20/2017
Project Awards
BOT Meeting 09/06/2017
Project Awards
- Contract Change Order #4 to Bell Products, Inc. for the Vallejo Center HVAC Upgrade Project
- Change Order #1 (Deductive) to LVH Entertainment Systems for Construction Services for Building 1200 Production Drapery and Lighting Project<
- Contract Change Order #13 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase 1) Project
- Contract Change Order #2 to Clark/Sullivan Construction for Autotechnology Project
- Measure Q Bond Project Initiation - Library/Learning Resource Center Project (Library Building 100 Replacement)
- Ratification of Contract to Advent Engineering Services, Inc. for Professional Services for the Biotechnology and Science Building Project
- Ratification of Contract to Yocha Dehe Wintun Nation for Cultural Resources Monitoring Services for the Science Building (Phase 1) Project
- Contract Award to Pavement Engineering, Inc. for Professional Services for the Fairfield Roadway Repair Project
BOT Meeting 08/16/2017
Project Awards
- Contract Change Order #3 to Bell Products, Inc. for the Vallejo Center HVAC Upgrade Project
- Contract Change Order #1 to Conti Corporation DBA Conti MEP Corporation for the Building 1200 Production Audio Visual Project
- Contract Change Order #1 to KD Specialty Contractor Inc. for the Building 1200 Marker Boards Project
- Contract Amendment #2 to Omni-Means Ltd. for Professional Services for the Vacaville Center Intersection Improvements Project
- Contract Award to Integrity Data & Fiber Inc. for Network Cabling Services for the Districtwide Information Technology Infrastructure Improvements Project (Phase 2)
- Ratification of Contract with Pacific Gas and Electric Company for Electric Service Facilities for Vacaville Center Intersection Improvements Project
BOT Meeting 08/02/2017
Project Awards
- Contract Award to Ellis & Ellis Sign Systems for Construction Services for Fairfield Campus Directory Signs Project
- Contract Award to HM Construction, Inc. for Construction Services for the Fairfield Campus Sidewalk Improvements Project
- Ratification of Contract Change Order #1 to Sierra National Construction, Inc. for Substation #1 & #2 Replacement Project
BOT Meeting 07/19/2017
Project Awards
- Contract Change Order #2 to Arthulia Inc. for the Costume Workshop Project
- Contract Change Order #2 to Bell Products, Inc. for the Vallejo Center HVAC Upgrade Project
- Contract Amendment #1 with CA Architects for Architectural and Engineering Services for the Softball Bleacher Replacement Project
- Contract Amendment #4 with Construction Testing Services Inc. for Vacaville Classroom Building Renovation Project
- Contract Amendment #1 with CA Architects for Architectural and Engineering Services for the Vacaville Classroom Building (Annex) Renovation Project
- Contract Amendment #1 with Premier Chemical Environmental Solutions for the Automotive Technology Building Project
- Contract Award to Optima Inspections Inc. for Project Inspection Services for the Fairfield Campus Entry Sidewalk Improvement Project
- Contract Award to Arthulia Inc. for Constructions Services for the Horticulture Farmers Market Cabinet Project
- Contract Award to CSW/Stuber-Stroeh Engineering Group, Inc. for Engineering Services for the Parking Lot Island Improvements Project
- Contract Award to Premier Chemical & Environmental Solutions for Asbestos Survey Consulting Services for the Fairfield Campus Substation #1 & #2 Replacement Project
- Contract Award to Quality Sound for Construction Services for the Building 1200 Fire Alarm Panel Programming Project
- Contract Award to tBP Architecture for Architectural and Engineering Services for the B100 Library Emergency Generator Project
- Ratification of Contract Award to Consolidated Engineering Laboratories for Project Special Inspection and Testing Services for the Vallejo Center HVAC Upgrade Project
- Ratification of Contract Award to Quality Sound for the Fire Alarm Programming and Installation for the Vallejo Center HVAC Upgrade Project
- Ratification of Contract for Construction Services to American Technologies, Inc. for Vacaville "Annex" Classroom Building
BOT Meeting 06/21/2017
Project Awards
- Ratification of Contract with Pacific Gas and Electric Company for Electric Service Facilities for Vallejo Autotechnology Building Project
- Funding Agreement with Solano Transportation Authority for the Fairfield Campus Entry Sidewalk Project
- Contract Amendment #1 to Visions Management for Professional Services for Performing Arts Building Swing Space Project and Program Management
- Contract Amendment #2 With Ninyo & Moore for the Automotive Technology Building Project
- Contract Award to KD Specialty Contractors Inc. for Construction Services for the Building 1200 Marker Boards Project
- Contract Award to Ninyo & Moore for Special Inspection and Testing Services for the Vacaville Center Intersection Improvements Project and the Fairfield Campus Entry Sidewalk Project
- Gas Easement and Electric Easements to Pacific Gas and Electric for Vallejo Automotive Technology Building Project
- Ratification of Contract with Pacific Gas and Electric Company for Electric Service Facilities for Vacaville Center Intersection Improvements Project
- Contract Change Order #1 to Arthulia Inc. for the Costume Workshop Project
- Contract Change Order #1 to Bell Products, Inc. for the Vallejo Center HVAC Replacement Project
BOT Meeting 06/07/2017
Project Awards
- Contract Amendment #2 to Dovetail for Furniture, Fixtures, and Equipment Consulting Services for the Biotechnology & Science Building Project
- Contract Amendment #1 to First Carbon Solutions for Environmental Cultural Resources Monitoring Services for the Science Building (Phase I) Project
- Contract Amendment #1 to Van Pelt Construction Services for Construction Management Services for Building 1200 Theater Renovation Project
- Contract Change Order #12 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
- Contract Award to Dell EMC for Professional Services for the IT Infrastructure Improvesment s (Phase 2)
- Revised Traffic Signal Equipment Easement to City of Vacaville for Vacaville Center Intersection Improvements Project
BOT Meeting 05/17/2017
Project Awards
- Contract Award to Consolidated Engineering Laboratories for Project Special Inspection and Testing Services for the New Science Building Project
- Contract Award to Optima Inspections Inc. for Project Inspection Services for the New Science Building Project
- Contract Award to Suddath Relocation Systems of No. Cal, Inc. for Project Moving Services for Swing Space for the Vallejo Center HVAC Upgrade Project
- Lease Agreement Extension to Williams Scotsman for Modular Buildings
BOT Meeting 05/03/2017
Project Awards
- Contract Award to 3QC, Inc. for Commissioning Services for the Vallejo Center HVAC Upgrade Project
- Contract Award to Arthulia Inc. for Construction Services for the Costume Workshop Project
- Contract Award to Optima Inspections Inc. for Project Inspection Services for Vallejo Center HVAC Upgrade Project
- Contract Award to TPA Construction In. for Construction Services for the Vacaville Annex Building Truss Repair Project
- Contract Award to Transitions Inc. for Professional Move Management and Moving Services for Biotechnology and Science Building
BOT Meeting 04/19/2017
Project Awards
- Contract Amendment #3 with Construction Testing Services Inc. for Vacaville Classroom Building Renovation Project
- Contract Award to Bell Products, Inc. for Construction Services for the Vallejo Center HVAC Upgrade Project
- Contract Award to TPA Construction, Inc. for Construction Services for the Building 1200 Storage Systems and Accessories Project
- Contract Award to Vaca Valley Excavating & Trucking, Inc. for Construction Services for the Vacaville Center Intersection Improvements Project
- Measure Q Bond Project Initiation – ADA Improvements Project – Phase I
- Measure Q Bond Project Initiation – IT Infrastructure Improvements Project – Phase 2
- Measure Q Bond Project Initiation – Small Capital Projects – Phase 2
- Measure Q Bond Spending Plan Update #6
BOT Meeting 04/05/2017
Project Awards
- Contract Change Order #10 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase 1) Project
- Change Order #1 (Deductive) to American Technologies, Inc. for Vacaville "Annex" Classroom Building Truss Repair
- Contract Change Order #11 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase 1) Project
- Contract Award to 3QC, Inc. for Commissioning Services for the Science Building Project
- Contract Award to All County Flooring for Construction Services for the Building 1400 Flooring Replacement Project
- Contract Award to Tiber Painting LLC for Construction Services for the Vacaville Center Painting Project
BOT Meeting 03/15/2017
Project Awards
- Contract Award to TYR, Inc. for Project Inspection Services for Substation #1 & #2 Replacement Project
- Change Order #1 to Landmark Construction for the Softball Bleacher Replacement Project
- Contract Amendment #2 with CSW/Stuber-Stroeh Engineering Group, Inc. for Engineering Services for the Campus Entry Sidewalk Improvements Project
- Contract Award to LVH Entertainment Systems for Construction Services for Building 1200 Production Drapery and Lighting Project
- Contract Award to MADI Architects for Architectural Services for Roofing Replacement Project - B1500, B1000 and B300
- District Standards - Wayfinding Signage
- Traffic Signal Equipment Easement and Public Sidewalk Easement for City of Vacaville for Vacaville Center Intersection Improvements Project
BOT Meeting 03/01/2017
Project Awards
- Contract Change Order #1 to DPR Construction for the Fairfield Science Building Project
- Contract Award to CA Architects for Architectural and Engineering Services for the Vacaville Classroom Building (Annex) Renovation Project
- Contract Award for Construction Services to Landmark Modernization Contractors dba Landmark Construction for the Softball Bleacher Replacement Project
- Contract Award to Optima Inspections Inc. for Project Inspection Services for Softball Bleacher Replacement Project
- Contract Award to Stageright Corporation for the Building 1200 Orchestra Shell Project
- Contract Award to Swinerton Management and Consulting for Construction Management Services for the Fairfield Campus Entry Sidewalk Improvements Project
- Contract Award to Swinerton Management and Consulting for Construction Management Services for the Vallejo Center HVAC Improvements Project
- Contract Award to Wallace Kuhl & Associates for Project Special Inspection and Testing Services for the Softball Bleacher Replacement Project
- Contract Award to Conti Corporation dba Conti MEP Corporation for the Building 1200 Production Audio Visual Project
- Change Order #3 to Pro Builders for the Horticulture Site Improvements Project
BOT Meeting 02/15/2017
Project Awards
BOT Meeting 02/01/2017
Project Awards
- Contract Award for Construction Services to Sierra National Construction, Inc. for the Sub-Station #1 & #2 Replacement Project
- Change Order #1 to Pro Builders for Site Horticulture Site Improvements Project
- Contract Change Order #9 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
BOT Meeting 01/18/2017
Project Awards
- Contract Amendment #1 with CSW/Stuber-Stroeh Engineering Group, Inc. for Engineering Services for the Campus Entry Sidewalk Improvements Project
- Contract Amendment #1 with Omni-Means Ltd. for Professional Services for Vacaville Center Intersection Improvements Project
- Contract Award to Premier Chemical & Environmental Solutions for Consulting Services for the New Aeronautics Building at the Vacaville Nut Tree Site
- Contract Award for Construction Services to American Technologies, Inc. for Vacaville "Annex" Classroom Building Truss Repair
- Measure Q Bond Project Initiation - Vallejo Center HVAC Upgrade Project
BOT Meeting 12/21/2016
Project Awards
- Contract Amendment #1 with EDESIGNC Inc. for Vacaville and Vallejo Centers HVAC Improvements and Upgrades Project
- Contract Change Order #7 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase 1) Project
- Contract Change Order #8 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase 1) Project
- Contract Amendment #1 with Kate Keating Associates, Inc. for Graphic Design Services for Signage
- Contract Award for Construction Services to Precision Insulation, Inc. for Hydronic Pump Insulation Project
BOT Meeting 11/16/2016
Project Awards
- Contract Amendment #2 with Construction Testing Services Inc. for Vacaville Classroom Building Renovation Project
- Contract Award to DPR Construction for Design Build Services for the New Science Building Project at the Fairfield Campus
- Contract Award to Premier Chemical & Environmental Solutions for Consulting Services for the Auto Technology Building Project in Vallejo
- Contract Award to Premier Chemical & Environmental Solutions for Consulting Services for the New Science Building Project at the Fairfield Campus
- Contract Award to Swinerton Management and Consulting for Construction Management Services for the Fairfield Substations #1 and #2 Replacement Project
- Contract Award to Swinerton Management and Consulting for Construction Management Services for the Vacaville Center Intersection Improvements Project
- Public Improvement Agreement with City of Vacaville for Intersection Improvements at Vacaville Center Entry Drive at North Village Parkway
BOT Meeting 11/02/2016
BOT Meeting 10/19/2016
Project Awards
- Lease agreement extensions to William Scotsman Inc., for Modular Buildings
- Contract Change Order #6 to BHM Construction Inc., for Building 1200 Performing Arts Renovation (Phase 1) Project
- Resolution to Approve Change Order #01 to Prime Mechanical for Pool Room Heat Exchangers Replacement Project, Resolution No. 16/17-07
- Measure Q Bond Spending Plan Update #3
BOT Meeting 10/05/2016
Project Awards
BOT Meeting 09/21/2016
Project Awards
- Contract Award to CSW/Stuber-Stroeh Engineering Group Inc. for Engineering Services for the Campus Entry Sidewalk Improvements Project
- Contract Award to CA Architects for Architectural and Engineering Services for the Performing Arts Costume Workshop and Classroom Project
- Contract Amendment #1 with CA Architects for Architectural and Engineering Services for Vacaville Classroom Building Project
- Contract Amendment #3 with LPAS for Building 1200 Theater Renovation Project
- Change Order #1 to Integrity Data & Fiber for the Districtwide Information Technology Infrastructure Improvements Project and Building 1200 Performing Arts Renovation (Phase) Project
- Contract Change Order #4 to BHM Construction Inc for Building 1200 Performing Arts Renovation
- Change Order - No. 01 (Deductive) to Arthulia, Inc. for Site Lighting Improvements Project
- Change Order - No. 01 (Deductive) to TPA Construction, Inc. for Measure Q Thank You Signs Project
- Resolution to Approve Change Order #2 to TPA Construction for B100 Academic Success Center and Tutoring Expansion Project, Resolution No. 16/17-06
BOT Meeting 08/17/2016
Project Awards
- Contract Award for Construction Services to TPA Construction, Inc. for Building 100 Lobby Furniture and Electrical Improvements Project
- Amendment #1 with County of Solano for Aeronautics & Workforce Development Building Project
- Contract Amendment #1 with Hazard Management Services for Professional Services for the Asbestos Abatement Project
- Contract Change Order #1 to Clark/Sullivan Construction for Autotechnology Project
- Contract Change Order #1 to Lister Construction for the Water Line Shut Off Valves Project
- Change Order No. 01 to Quality Painting & Construction for the Vallejo Center Exterior Painting Project
BOT Meeting 07/20/2016
- Change Order - No. 01 to Cooper Oates Air Conditioning for Hydronic Pumps Replacement Project
- Change Order -No. 01 to Quality Sound for Fire Alarm Control Panels Upgrade Project
- Change Order -No. 03 to Southwest Construction for Buildings 1600, 1800A, and 1900 Re-Roofing Project
- Change Order -No. 03 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
- Contract Award to CA Architects for Architectural and Engineering Services for the Softball Field Bleacher Replacement Project
- Contract Award to JRDV Architects Inc. for Architectural Site Master Planning Services for the Aeronautics and Workforce Development Building Project
- Contract Award for Construction Services to Pro Builders for the Horticulture Site Improvements Projects
- Contract Award to Trinity EMCS Inc. to Perform Retro-Commissioning Services for the HVAC/EMS Efficiency Project
BOT Meeting 06/15/2016
- Change Order - No. 02 (Deductive) to Southwest Construction for Buildings 1600, 1800A, and 1900 Re-Roofing Project
- Contract Amendment #1 with Development Group Inc. For Professional Services for the B100 Academic Success Center and Tutoring Expansion Project
- Contract Amendment #1 with Dovetail for Consulting Services for the Furniture Replacement Project
- Contract Amendment #1 for MADI Architecture for Design Services for the Horticulture Site Improvements Project
- Contract Award for Construction Services to Arthulia, Inc. for 21st Century Classrooms - Phase 2 Project
- Contract Award to Dell Marketing L.P. for Professional Services for 21st Century Classroom - Phase 2 Project
- Contract Award to MADI Architects for Professional Services for B100 Lobby Lighting & Electrical Improvements Project
- Contract Award to Omni-Means Ltd. for Professional Services for Vacaville Center Intersection Improvements Project
- Contract Award to Utelogy Corporation for Professional Services for 21st Century Classroom - Phase 2 Project
- Contract Award to JK Architecture Engineering for Professional Services for Aeronautics and Workforce Development Project
BOT Meeting 05/18/2016
Project Awards
- Contract Award to Visions Management for Professional Services for Performing Arts Building Swing Space Project and Program Management
- Contract Award for Professional Commissioning Authority Services to Glumac for the Autotechnology Building Project
- Contract Change Order #2 to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
- Contract Award for Project Inspector Services to Optima Inspections Inc. for Horticulture Site Improvements Project
- Contract Award to Construction Testing Services Inc. (CTS) for Special Inspection and Testing Services for the for Horticulture Site Improvements Project
- Approval of Mitigated Negative Declaration (MND) for Science Building Project, Fairfield, California
- Contract Award to Calvary Construction for Construction Services for the Asbestos Abatement Project
- Contract Award to Hazard Management Services for Professional Services for Asbestos Abatement Project
- Contract Award to GeoTech Utility Locating for Professional Services for Water Line Shut Off Valves Project
- Contract Award to Lister Construction for Construction Services for the Water Line Shut Off Valves Project
- Contract Amendment #1 with Dovetail for Furniture, Fixtures and Equipment Consulting Services for the B100 Academic Success Center and Tutoring Expansion Project
- Contract Award to Crown Worldwide Moving and Storage for Professional Services for B100 Academic Success Center and Tutoring Expansion Project
- Contract Award to MADI Architects for Professional Services for 21st Century Classroom - Phase 2 Project
BOT Meeting 05/04/2016
Project Awards
BOT Meeting 04/20/2016
Project Awards
- Contract Amendment No. 6 with Kitchell CEM Inc. for Construction Management Services
- Contract Award to Prime Mechanical for Construction Services for Pool Pump Room Heat Exchangers Replacement Project
- Contract Award to QualitySound for Construction Services for Fire Alarm Control Panels Upgrade Project
- Contract Amendment to CSW/Stuber-Stroeh Engineering Group, Inc., for Civil Engineering Services for the Fairfield Campus Agriculture (Horticulture) Project
- Contract Amendment #1 with Wallace Kuhl & Associates for Geotechnical Services for the Vacaville Workforce Development and Aeronautics Building Project
- Contract Amendment #1 with CA Architects for Architectural Services for Site Lighting Improvements Project
- Contract Award for Construction Services to Arthulia, Inc. for the Site Lighting Improvements Project and Small Capital Project
- Contract Award to Optima Inspections Inc., for Project Inspection Services for Site Lighting Improvements Project
- Contract Award to Guidepost for Professional Services for Security Camera System Planning Project
- Contract Amendment #1 with Lionakis for Architectural Services for the Fairfield New Science Building Project
- Contract Award for Construction Services to Cavalry Construction, Inc. for the Building 1300 Kiln Fence Project
- Contract Award to Optima Inspections Inc. for Project Inspection Services for Building 1300 Kiln Fence Project
- Contract Award for Construction Services to The Boldt Company for the Building 200 Kitchen Renovation Project
- Contract Award for Inspector of Record Services to Optima Inspections Inc. for the Building 200 Kitchen Renovation Project
- Contract Award for Construction Services to TPA Construction for the Building 100 Academic Success and Tutoring Expansion Project
- Contract Award for Project Inspection Services to Optima Inspections Inc. for the Building 100 Academic Success and Tutoring Expansion Project
- Contract Award for Professional Commissioning Authority Services to Engineering Economics Inc. for the Vacaville Biotechnology Project
- Contract Award for Professional Commissioning Authority Services to Glumac for the Building 1200 Performing Arts Renovation (Phase 1) Project
- Contract Award for Professional Engineering Services to EDesignC Incorporated for the Vacaville and Vallejo Centers HVAC Improvements and Upgrades Project
- Contract Award to Pavement Engineering Inc. for Professional Services for Pavement Assessment Project
- Contract Award for Construction Services to TPA Construction for the Measure Q Thank You Signs Project
- Contract Award to Utelogy Corporation for Professional Services for Districtwide IT Infrastructure Improvements Project
BOT Meeting 04/06/2016
BOT Meeting 03/16/2016
- Contract Award to Cooper Oates Air Conditioning for Construction Services for Hydronic Pumps Replacement at Fairfield Project
- Contract Award to Construction Testing Services Inc. (CTS), for Project Special Inspection and Testing Services for the Science and Biotechnology Building Project
- Contract Award to Junk Pros for Professional Services for Disposal of Surplus FF&E Project
- Contract Award to Swinerton Management and Consulting for Construction Management Services for Science Building Phase I Project
BOT Meeting 02/17/2016
- Contract Amendment with LPAS for Building 1200 Theater Renovation Project Architectural Services
- Contract Award to Crown Worldwide Moving and Storage for Professional Services for Furniture Move 360 Campus Lane Project
- Contract Award to Ninyo & Moore for Project Special Inspection and Testing Services for the Automotive Technology Building Project
- Contract Award to Dovetail for Consulting Services for the Furniture Replacement Project
- Contract Award to Hazard Management Services, Inc. for Professional Services for Asbestos Abatement Project
- Contract Award to tBP Architecture for Professional Services for B1400 Food Service Area Assessment
- Contract Award to TYR, Inc. for Project Inspection Services for the Automotive Technology Building Project
- Purchase Order to Integrity Data and Fiber, Inc. for Cabling for Building 100 Academic Success Center and Tutoring
- Purchase Order to JLC Contracting, Inc. for Electrical Outlets for Building 100 Academic Success Center and Tutoring
BOT Meeting 01/20/2016
- Contract award to Commercial Design Inc. for Construction Services for B1300 Counter Top Replacement Project
- Contract Award to Premier Chemical Environmental Solutions for Consulting Services for B1200 Renovation Swing Space Project
- Contract Award to CA Architects for Professional Services for Utility Infrastructure Upgrade – Fairfield Substation 1 and 2 Replacement Project
- Contract Award to CA Architects for Professional Services for Utility Infrastructure Upgrade – Fairfield Exterior Lighting Project
BOT Meeting 12/16/2015
- Contract Amendment to Dovetail for Furniture, Fixtures and Equipment Consulting Serives for the Biotechnology and Science Building Project
- Contract Amendment with Strata Information Group for Consulting Services for the Information Technology Infrastructure Improvements Project
- Contract Award to Dovetail for Furniture, Fixtures and Equipment Consulting Services for the B100 Academic Success Center Expansion Project
- Contract Award to Kate Keating Associates, Inc. for Graphic Design Services for Interior Signage Standards Project
- Contract Award to Premier Chemical & Environmental Solutions for Biotechnology Project Consulting Services
- Contract Award to Madi Architects for Architectural Services for B100 Academic Success Center Expansion Project
- Contract Award to Optima Inspections, Inc., for Project Inspection Services for the Biotechnology and Science Building Project
- Contract Award to TPA Construction, Inc. for Construction Services for B1200 Renovation Swing Space Project
- Contract Award to Wallace Kuhl & Associates, for Geotechnical Services for the VAcaville Workforce Development and Aeronautics Building Project
BOT Meeting 11/19/2015
- Contract Amendment to CA Architects for Architectural and Engineering Services
- Contract Amendment to CSW/Stuber-Stroeh Engineering Group, Inc., for Civil Engineering Services for the Fairfield Campus Agriculture (Horticulture) Project
- Purchase Order to WeidnerCA for Wayfinding Signage for Building 600
- Contract Amendment to Dovetail for Program Level Furniture, Fixtures and Equipment Consulting Services
- Contract Award to Optima Inspections, Inc. for Project Inspection Services
- Contract Award to Cornerstone Technologies LLC, for Vallejo VDI Deployment Services for the Information Technology Infrastructure Improvements Project
- Contract Award to Decorator Draperies for Construction Services
- Contract Award to All Clear Inc. For Construction Services for Horticulture Site Tree Removal Project
- Contract Award to CA Architects for Architectural Services for CDFS Kitchen Renovation Project
BOT Meeting 10/21/2015
- Contract Amendment with CA Architects for Architectural Services for Performing Arts Building (B1200 Renovation) Swing Space Project
- Contract Award to Berger Steel Corporation for Construction of Building 1300 Kiln Project
- Contract Award to Consolidated Engineering Laboratories for Special Inspection Services for Building 1300 Kiln Project
- Contract Award to Optima Inspections, Inc., for Project Inspection Services of Building 1300 Kiln Project
- Contract Award to Decorator Draperies for Construction Services for CDFS Building Window Shades and Limited Kitchen Renovation Project
- Contract Award to Dovetail for Furniture, Fixtures and Equipment Consulting Services for the Biotechnology and Science Project
- Award to OmniUpdate for Professional Services for Measure Q Website Communications
- Contract Award to Optima Inspections. Inc., for Project Inspection Services of Building 1600, 1800-A and 1900 Re-Roofing Project
- Contract Award for Construction Services to Southwest Construction and Property Management Corporation for the Buildings 1600, 1800-A and 1900 Re-Roofing Project
- Contract Award to Terracon Consultants, Inc., for Geotechnical Services for the Horticulture Project
- Contract Award for Construction Services to TPA Construction, Inc., for Small Capital-Technology Classrooms Building 800 Project
BOT Meeting 10/07/2015
BOT Meeting 09/16/2015
- Contract Amendment with Dannis Woliver Kelley (DWK), Legal Services and Construction Attorneys for Measure G and Measure Q Bonds
- Contract Award to BHM Construction Inc. for Building 1200 Performing Arts Renovation (Phase I) Project
- Contract Award to First Carbon Solutions for California Environment Quality Act (CEQA) Services for the Science Building (Phase I) Project
BOT Meeting 09/02/2015
BOT Meeting 08/19/2015
- Contract Award to Development Group Inc., for Professional Services for the Districtwide Information Technology Infrastructure Improvements Project
- Contract Award to Optima Inspections Incorporated for DSA Project Inspection Services for the Vacaville Classroom Building Renovation
- Contract Award to Construction Testing Services, Inc. for DSA Special Inspection Services for the Vacaville Classroom Building Renovation Project
- Contract Award to JLC Contracting Inc., for Electrical Construction Services for Small Capital Projects - Portable Classrooms Phase II, Exterior Lighting
- Contract Amendment to Kitchell Capital Expenditure Managers for Program and Design Management Services for the Science Building Project
- Contract Award to Best Instrument Repair for B1200 Performing Arts (Phase I Renovation) Specialty Equipment Assessment Services
- Districtwide Tree Removal Plan
BOT Meeting 08/05/2015
- Contract Award to Rudolph & Sletten for the Design and Construction of the Biotechnology and Science Building Project
- Contract Award to Aquatic Design Group Inc. for Architectural and Engineering Services for the Swimming Pool Deck Improvement Project
- Contract Award to IDF for Construction Services for Small Capital Projects: B1600 Classroom Improvements and Portable Classrooms Phase II Improvement Project
- Contract Award to JLC Contracting, Inc., for Construction Services for the Performing Arts Building (B1200 Renovation) Swing Space Project
- Contract Award to IDF for Construction Services for Small Capital Projects: Building 1800 Classroom Improvements and Technology Classroom Projects
- Contract Award to JLC Contracting, Inc., for Electrical Construction Services for the Performing Arts Building (B1200 Renovation) Swing Space and Technology Classroom Projects
- Contract Amendment to ED2 International for Design - Build Review Services for the Vacaville Biotechnology & Science Project
- Contract Award to Omni - Means LTD for Traffic Engineering Services for the Vacaville Classroom Building Renovation Project
- Districtwide Tree Removal Plan
BOT Meeting 07/15/2015
- Contract Amendment to Utelogy for Professional Services for Small Capital Projects: Building 1600 Classroom Improvements and Portable Classrooms (Phase II)
- Contract Amendment to Swinerton Management and Consulting for Construction Management Services for the Automotive Technology Project
- Contract Amendment to Swinerton Management and Consulting for Construction Management Services for the Biotechnology and Science Building Project
- Contract Award to JLC Contracting, Inc., for Construction Services for Small Capital Projects - Portable Classrooms (Phase II)
- Contract Award to MADI Architects for Architectural and Engineering Services for the Agriculture (Horticulture) Project
- Contract Award to JLC Contracting, Inc., for Electrical Services for Small Capital Projects - Building 1800 Classroom Improvements Project
- Contract Award to Lionakis for Architectural and Engineering Assessment Services for Small Capital Projects – Building 300 Feasibility Study
- Contract Award to CA Architects for Architectural and Engineering Services for Building 1300 Kiln Design Project
- Contract Award to Wallace Kuhl & Associates for Geotechnical Services for the Science Building (Phase I) Project
- Contract Award to Decorator Draperies for Construction Services for Small Capital Projects: Technology Classrooms Implementation and Building 1800 Classroom Improvements Project
- Contract Award to Sac Valley Electric for Construction Services for Small Capital Projects - Portable Classrooms (Phase II)
- Contract Award to Development Group Inc., for Professional Services for the Districtwide IT Infrastructure Improvements Project
BOT Meeting 06/17/2015
- Contract Amendment to MADI Architects for Architectural Services for Building 1600 Roof Replacement Project
- Contract Amendment to Visions Management for Move Management Services for Building 1200 Performing Arts Renovation (Phase 1) Swing Space Project
- Contract Award to Dovetail for Furniture, Fixtures and Equipment Consulting Services for the Autotechnology Building Project
- Contract Award to Consolidated Engineering Laboratories for DSA Special Inspection Services for Building 1200 Performing Arts Renovation (Phase 1) and Swing Space Project
- Contract Award to the Shalleck Collaborative Inc., for Equipment Consulting Services for Building 1200 Performing Arts Renovation (Phase 1) Project
- Contract Award to CA Architects for Architectural and Engineering Services for Small Capital Projects – Portable Classrooms Phase II and Building 1800 Classroom
- Contract Award to Gilbane for Construction Management Services for the Science Building Project (Phase I)
BOT Meeting 06/03/2015
- Contract Award to Utelogy Corporation for Professional Services for the Portable Classrooms Phase II – Small Capital Project
- Contract Award to Wall 2 Wall Painting for Construction Services for the Biotechnology and Science Building Classroom Improvement
- Contract Award to Tyrell Plumbing for Construction Services for the Biotechnology and Science Building Classroom Improvement Project
- Contract Award to Sac Valley Electric, Inc., for Construction Services for the Biotechnology and Science Building Classroom Improvement Project
- Contract Award to Sac Valley Electric Inc., for Fire Alarm Installation for the Portable Classrooms Phase II – Small Capital Project
- Contract Award to JLC Contracting, Inc., for Building 1200 Performing Arts Renovation (Phase I) Swing Space Project
- Contract Award to Gilbane for Construction Management Services for the Science Building Project (Phase I)
BOT Meeting 05/20/2015
- Contract Amendment to Dovetail for Program Level Furniture, Fixtures and Equipment Consulting Services
- Contract Amendment to Lionakis for Architectural Services for the Autotechnology Building Project in Vallejo
- Contract Award to Gilbane for Construction Management Services for the Science Building Project (Phase 1)
- Contract Award to Sac Valley Electric for Fire Alarm Installation for Building 1200 Performing Arts Renovation (Phase 1) Swing Space and Small Capital Projects
- Contract Award to Optima Inspection Inc., for DSA Project Inspector Services for Building 1200 Performing Arts Renovation (Phase 1) and Swing Space Projects
- Contract Award to Verde Design for Fairfield Campus Facilities Master Planning Services
- Contract Amendment to Scheer Intelligence for Consulting Education Master Plan Services for the Vacaville Nut Tree Airport
BOT Meeting 05/06/2015
- Contract Award to Corovan Moving Company Inc., for Building 1200 Performing Arts Building Renovation Swing Space and Utility Infrastructure Upgrade (Energy Projects)
- Contract Award to Geotech for Utility Locating Services for Building 1000 Horticulture Project
- Contract Award to Integrity Data & Fiber for Building 1200 Performing Arts Renovation (Phase 1) Swing Space and Small Capital Projects
- Contract Award JLC Contracting, Inc., Building 1200 Performing Arts Renovation (Phase 1) Swing Space and Small Capital Projects
- Contract Award to MADI Architects for Architectural Services for the Small Capital Project
- Contract Award to Sac Valley Electric for Electrical Services for Building 1200 Performing Arts Renovation (Phase 1) Swing Space and Small Capital Projects
BOT Meeting 04/15/2015
- Contract Award to Visions Management for Move Management & Coordination Services for the Performning Arts Building (Building 1200 Renovation) Swing Space & Utility Infrastructure Upgrade (HVAC/EMS) Projects
- Contract Award to FirstCarbon Solutions for California Environmental Quality Act (CEQA) Services for the Vallejo Campus
- Notice of Completion for Hazardous Materials Abatement of Building 1100 Portables, for the Performing Arts Building (B1200 Renovations) Swing Space Project
- Lease Agreement Approval to Williams Scotsman Inc., for DSA Pre-Approved Modular Classrooms for the Performing Arts Building Swing Space Project & Small Capital Improvement Projects
- Measure G Bond Spending Plan & Close-Out Plan
BOT Meeting 03/18/2015
- Contract Award to Madi Architects for Architectural Services for Buildings 1800A and 1900 Roof Replacement Project
- Contract Award to J.R. Wagner, Inc., for Pressure and Fire Flow Readings Consulting Services for Vacaville Classroom Building
- Contract Award to CA Architects for Architectural Services for Performing Arts Building (B1200 Renovation) Swing Space Project
- Contract Award to PAE Consulting Engineering Inc., for Consulting Services for Small Capital Projects – Building 100 Data Center
- Notice of Completion for Vacaville and Vallejo Centers Building ID Signage Project
- Contract Amendment to Joseph Gumina for Equipment Planning Services for Vallejo Autotechnology Swing Space Project
- Contract Amendment to Henley Architects & Associates for Architectural Services for Building 600 (Administration) Renovation Project
- Contract Amendment to Matriscope Engineering Laboratories, Inc., for Special Inspections and Lab Testing Services for Building 600 (Administration) Renovation Project
- Contract Award to Dovetail for Furniture, Fixtures, and Equipment Consulting Services for the Biotechnology and Science Building Project
- Contract Award to Maintenance Design Group for Consulting Services for the Autotechnology Building Project
- Measure Q Equity Inclusion and Outreach Guidelines for Contractors
- Citizens Bond Oversight Committee CBOC Annual Report to the Governing Board
- Change Orders No 01 Deductive to Mike Brown Electric and No 04 to Sunpower
BOT Meeting 02/18/2015
- Contract Award to CSW/Stuber - Stroeh Engineering Group, Inc., for Civil Engineering Services for the Biotechnology and Science Project
- Contract Award to CA Architects for Professional Services for Building 1300 Kiln Assessment
- Contract Award to CSW/Stuber - Stroeh Engineering Group, Inc. for Civil Engineering Services for the Fairfield Agriculture (Horticulture) Project
- Contract Award to Decorator Draperies for Blinds Installation for Building 600 Project and Classroom Upgrades - Building 1400 Project
- Contract Award to Corovan Moving and Storage Company for Performing Arts Building (Building 1200 Renovation) Swing Space Project
- Contract Award to Scheer Intelligence for Consulting Education Master Plan Services for Vacaville Nut Tree Airport
- Contract Award to Utelogy Corporation for Professional Services for District - Wide Information Technology Infrastructure Improvements Project
- Measure Q Bond Spending Plan Update
BOT Meeting 01/21/2015
- Contract Award to Professional Asbestos and Lead Services, Inc., for Hazardous Materials Abatement for the Performing Arts Building (B1200) Renovation, Swing Space Project
- Contract Award to CA Architects for Professional Services for Vacaville Classroom Building Project
- Contract Award to CSW/Stuber - Stroeh Engineering Group, Inc., for Civil Engineering Services for Utility Infrastructure Upgrades, Vallejo Belvedere Site Utility Mappin
- Contract Award to RGA Environmental for Hazardous Materials Consulting Services for the Performing Arts Building (B1200) Renovation, Swing Space Project
- Contract Award to A Plus Tree, Inc., for Professional Services for A Districtwide Tree Assessment
- Contract Award to JLC Contracting Inc., for Vallejo Autotech Building Swing Space Project
- Contract Award to Sac Valley Electric for Lighting Design and Installation for the Utility Infrastructure Upgrade Project
BOT Meeting 12/17/2014
- Contract Award to Lionakis for Architectural Services for Science Building Project Phase I
- Contract Award to Lionakis for Architectural Services for Science Building Project Phase I - Exhibit A
- Contract Award to Lionakis for Architectural Services for Science Building Project Phase I - Exhibit BCDEFGH
- Contract Award to Dovetail for Program Level Furniture, Fixtures and Equipment Consulting Services
BOT Meeting 12/03/2014
BOT Meeting 11/19/2014
- Contract Award to Swinerton Management and Consulting for Construction Management Services for the Auto Technology Project
- Contract Award to Swinerton Management and Consulting for Construction Management Services for the Auto Technology Project - Exhibit A
- Contract Award to Swinerton Management and Consulting for Construction Management Services for Biotechnology Project
- Contract Award to Swinerton Management and Consulting for Construction Management Services for Biotechnology Project - Exhibit A
- Contract Award to WeidnerCA for Vacaville and Vallejo Centers Building Identification Project
- Contract Award to Communication Strategies for Technology Design Services for Districtwide Information Technology Infrastructure Project
- Bid Award to Professional Asbestos and Lead Services Inc., for the Utility Infrastructure Upgrade - HVAC/EMS Efficiency Project
- Contract Award to Crown Worldwide Moving and Storage for Moving Services for the Administration Building Renovation (Building 600) Project
- Contract Award to Optima Inspections Inc., for Project Inspector Services for the Utility Infrastructure Upgrade - HVAC/EMS Efficiency Project
BOT Meeting 11/05/2014
BOT Meeting 10/15/2014
- Contract Award to ED2 International for Architectural Services for Biotechnology and Science Project
- Contract Award to Lionakis for Architectural Services for Autotechnology Project
- Award to Eadoc LLC for Measure Q Consulting Services
- Award to HRA Consulting Engineers for Electrical Engineering Services for Biotechnology & Science Swing Space Project
- Award to Kitchell CEM for Program and Design Management Services - Exhibit D (Fee Proposal)
- Award to Kitchell CEM for Program and Design Management Services - Exhibits A-D
- Award to Kitchell CEM for Program and Design Management Services
- Award to JLC Contracting for Small Capital Projects - Vacaville Center Furniture Anchorage Project
- Award to Premier Chemical Environmental Solutions for Vacaville and Vallejo Centers
- Award for Consultant Services to Joseph Gumina for Equipment Planning Services for Vallejo Autotechnology Swing Space Project
BOT Meeting 09/17/2014
- Small Capital Projects
- Performing Arts Building (Phase 1, B1200 Renovation)
- Science Building (Phase I)
- IT Infrastructure Improvements
- Utility Infrastructure Upgrade (Energy)
- VV Biotechnology & Science Building
- VJ Autotechnology Building
- VV Classroom Building Purchase & Renovation
BOT Meeting 09/03/2014
BOT Meeting 08/20/2014
- LPAS for Bldg. 1200 Theater Renovation Project Architectural Services
- Henley Architects & Associates for Architectural Services for B600 Admin Project
Contract Awards
- Corovan Moving and Storage Company Inc. for Bio and Autotech Bldgs Swing Space
- Dudek for Environmental Planning Services for Vacaville Center Site
- Integrity Data and Fiber for Vallejo Autotech Building Project
- Van Pelt Construction Services for Construction Management Services for B1200 Theater Renovation